The Phase-2 Upgrade of the CMS Endcap Calorimeter This document is the Technical Design Report (TDR) of the MIP Timing Detector (MTD), a new detector planned for CMS during the High Luminosity LHC (HL-LHC) era. This Technical Design Report describes the ongoing developments and plans towards the upgrade of the CMS Level-1 trigger for the High-Luminosity Large Hadron Collider.Ī MIP Timing Detector for the CMS Phase-2 Upgrade The Phase-2 Upgrade of the CMS Level-1 Trigger The Phase-2 Upgrade of the CMS Data Acquisition and High Level Trigger The Phase-2 Upgrade of the CMS Beam Radiation Instrumentation and Luminosity Detectors The Run 4 Heavy Ion program of the LHC offers great physics opportunities to CMS and ATLAS of Chemistry, College Park, MD 20742, USA) Longo, R (University of Illinois at Urbana-Champaign, Physics, Urbana, IL 61801) MacLean, D (University of Illinois at Urbana-Champaign, Physics, Urbana, IL 61801) et al. of Chemistry, College Park, MD 20742, USA) Lantz, C (University of Illinois at Urbana-Champaign, Physics, Urbana, IL 61801) Lascio, S (University of Maryland, Dept. of Physics, Lawrence, KS 66045, USA) Koeth, T (University of Maryland, Dept. of Physics, New York, NY 10027, USA) Grosse Perdekamp, M (University of Illinois at Urbana-Champaign, Physics, Urbana, IL 61801) Hase, A (University of Kansas, Dept. of Physics, Beer-Sheva 84105, Israel) Cole, B (Columbia University, Dept. of Physics, Beer-Sheva 84105, Israel) Citron, Z (Ben-Gurion University of the Negev, Dept. Bashan, Y (Ben-Gurion University of the Negev, Dept. Search also in the full-text of all documents
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |